Ecopetrol S.A.
Construction and Maintenance Works of Electric Distribution Lines
Brochure
Download our document to see specific data of the service and how we work.
Let’s Start Work
Together
Please feel free to contact us. We will get back to you with 1-2 business days. Or just call us now.
About Project
With a team of highly trained technicians and experience in the energy sector, we guarantee quality and safety in each phase of the project, complying with current regulations and specifications required by clients.
San Fernando 115/34.5 kV Electrical Substation
Detailed engineering, procurement, construction, assembly, pre-commissioning, commissioning and start-up of the San Fernando 115/34.5 kV electrical substation for the Orinoquia Regional Vice-Presidency of Ecopetrol S.A. This project included all phases of the electrical infrastructure life cycle, guaranteeing its capacity to distribute energy safely and reliably.Water Disposal Pad – Caño Sur Este Project
Works for the construction of the water disposal pad for the Caño Sur Este project, belonging to Ecopetrol S.A.’s Hub Sur Oriente. This project involved the planning and execution of the necessary facilities for the disposal and treatment of wastewater in one of the company’s most important operational areas.Electrical Interconnection and Instrumentation at the Centauros Production Station
Works for the construction of the electrical interconnection and instrumentation at the Centauros Production Station, for the Caño Sur Este project, belonging to the Hub Oriente of Ecopetrol S.A. This work was key to ensuring interoperability between the different electrical installations and the station’s control systems, optimizing production and minimizing operational risks.4. Electrical Tracing System for the Centauros Production Station – Module 3
Design, supply and installation of the electrical tracing system for the Centauros Production Station of the Caño Sur Este project, Module 3. The electrical tracing system implemented ensures temperature control in critical equipment, such as pipes and valves, optimizing operation in extreme temperature conditions.5. Control Center – Com Room Package for the Rubiales Generation Center Synchronization Project. Supply, construction and assembly of the control center package – com room of the Rubiales Generation Center Synchronization project, corresponding to the South East Hub Management of the Vice Presidency of Projects and Drilling of Ecopetrol S.A. This project consisted of the installation of critical infrastructure for the control and monitoring of the generation centers, improving operational efficiency and energy management.
6. Maintenance of Electrical Systems and Lighting – Barrancabermeja Refinery
Maintenance service of the electrical distribution systems in the industrial areas, as well as the maintenance of the lighting facilities and transformers of the Barrancabermeja Refinery Management of Ecopetrol S.A., located in Barrancabermeja, Santander. This service included preventive and corrective interventions in the electrical installations of one of the most important refineries in the country, guaranteeing its continuous and safe operation.